Prost Builders was selected to design and build the Solid Waste Campus at the Landfill for the City of Columbia, Department of Public Works. This project consisted of three separate buildings: the 5,000 square foot Solid Waste Office, the 20,000 square foot Recycling Facility, and an equipment storage shelter. Two of the buildings were prefabricated steel structures and the equipment storage shelter was a pole barn structure.